Clifton Suspension Bridge Trust
Project Value – £150k
Internal alterations and refurbishment of an existing historic single storey building, to re-design the internal layout to provide two modern unisex cubicles, and one accessible toilet, including baby change facilities. All individually accessed externally
The following details the work carried out:
- Installation of heras fencing to designate the working area, and to include footpath suspension and diversion
- Demolition and strip out works
- Alteration of existing layout to incorporate new WC’s, education centre and cafe
- Electoral alterations and new installations
- Plumbing alterations and new installations
- Decoration works carpentry works, including new partitions
![logo-3 logo-3](https://newgateconstruction.co.uk/media/logo-3.png)
Henbury Court Primary Academy
Project Value – £25k
The following details the work carried out:
- Repairs to the existing single storey and two storey concrete encased steel columns to the junior block
- Concrete column works to the two school buildings
![oldfield-school oldfield-school](https://newgateconstruction.co.uk/media/oldfield-school.gif)
Oldfield School
We have carried out various projects with Oldfield School over the past 10 years.
Project Values – £5k – £30k
Various projects include the following:
- Reconfiguration & alteration works in association with Edmond Shipway to convert historic buildings into changing & shower facilities for specials sports coaching staff to suit requirements of the school sports status award
- Installation of new felt room to the admin block due to failure in the roof, works included external rendering and decorations
- Reconfiguration & alteration works in association with Edmond Shipway to convert the existing classrooms into brand new music rooms, works consisted of complete strip-out of these rooms and installation of new floor coverings, decorations, suspended ceilings
![Sheldon School - 2 Sheldon School - 2](https://newgateconstruction.co.uk/media/Sheldon-School-2.png)
Sheldon School
We have carried out various projects with Sheldon School over the past 15 years
Project Values – £10k – £130k
Various works include the following:
- Construction of New extension to gym changing room areas
- Refurbishment of Male & Female changing rooms
- Installation of new fascia’s & guttering
- Refurbishment of Science/Gym areas
- Refurbishment of Sixth Form Common area
- Refurbishment of Kitchen, Servery & Dining areas
- Redecoration of Classrooms throughout the school
![St Birinus St Birinus](https://newgateconstruction.co.uk/media/St-Birinus.png)
St Birinus College, Didcot
Re- Roofing of The Main Building including Upgrading Insulation & Fire Protection
Project Value – £450k
Works consist of the following:
- Stripping of existing roofs
- Installation of new roof coverings
- Timber treatment works
- Carpentry repairs
- Full scaffolding